
Tang Kar Jun
Architect in the Process

Building Services
Project 1: Application of Building Services




This project is related to the students’ studio design project in semester 2 which relates to a domestic size building (i.e. a retreat house, etc.) Students are expected to demonstrate their understanding of building services by proposing and designing the most appropriate systems for the building which include:
i) electrical supply system
ii) cold water and hot water supply system
iii) sewerage and sanitary system
iv) drainage system
Therefore students are required to produce appropriate drawings and diagrams which include specifications, symbols, legends, images, texts, etc. to describe the planning and installation of all the building services. Additionally, students may also include specific clauses from the Uniform Building By-Law (UBBL) or other relevant Acts, Laws or guidelines which relate to the proposed systems into their presentation boards
Learning Outcomes
I am now able to identify relevant information related to water supply, liquid waste disposal, mechanical air-conditioning, fire safety and vertical transportation system. This would help me a lot during the planning of a building service as well as the volume of space required for any particular service. I have also learnt to describe the planning of building services within the total design and construction process as well as the installation of building services within the total design and construction process.
Project 2: Case Study and Documentation of Building Services Systems
Final Report




Under the tutelage of a lecturer, each group is required to choose a building of 5-storey high which can be either public or commercial buildings (i.e. office blocks, institutional buildings, shopping malls, etc.). Each group is to perform a thorough study and analysis of the following services systems associated to the building:
i. mechanical ventilation
ii. air-conditioning system
iii. fire protection system (active and passive fire protection system)
iv. mechanical transportation system
The requirements of the project are as follows:
1. Identify all the required building services components installed in the building
2. Perform a thorough study on all the services systems
3. Obtain estimated dimensions and sizes of the spaces required for all the equipment and plant rooms identified
4. Provide brief explanation on how the building services components function. This explanation shall be in qualitative form and therefore no calculation is required.
5. Summarize the systems in diagrammatic form.
Learning Outcomes
After this project, I've learnt to identify and understand relevant information related to mechanical ventilation, air-conditioning, and mechanical transportation system as well as fire protection systems. By understanding how each building services functions including the connections and position of different parts equipment, I can explain the principles and systems as well as space implications and regulations related to different building services.